    Application: premise cable sheathing line apply to make simplex, duplex and distribution cable which has 2~24 fibers, cable coating material can be PVC, LSZH.


    Main feature:

    Distribution cable production line easy to operate, The equipment adopts industrial computer and programmable logic control (that is IPC+PLC mode) to realize the line's synchronal running and the independent operation. The production operation and the parameter set and display are carried out through the industrial computer. The production state collection and progress control are realized on PLC. The computer communicates with PLC, which can realize the production operation, the warning display, the line's emergency and other functions.


    Optical cable to make:

    image001_??.jpg

    Premise cable production line:

    Diameter of tight buffer

    F0.6mm,F0.9mm

    Diameter of premise cable

    F6.5mm (12 fibers)

    F8.2mm(24 fibers)

    Line speed

    =120m/min(single core, pvc)

    60m/min (12 cores, pvc)

    Size of tight buffer reel

    F400mm*F56*300

    Size of optical fiber reel

    25km or 50km reel for fiber

    Tight buffer pay-off tension

    0.4N~1.5N (adjustable)

    Optical fiber tension

    0.4~1.2N(adjustable)

    Stranding angle

    0~±6p

    Stranding Pitch

    80~400mm

    Aramid cops no.

    12cops

    Aramid pay-off tension

    0.6N~3N

    Extruder type

    SJ50/65 ×25

    Take-up tension

    5N~20N(Multi-fibers)

    3N~10N(simplex and duplex cable)

    Size of take-up reel

    PN1250mm

    PN630mm

    Line length

    Approximately 34 m

    Power requirement

    50Kw

    Line operation direction

    appointed by consumer

    Line color

    appointed by consumer

    Line center height

    1000mm

    Overall dimension

    34m*3m*3m


    Distribution cable jacketing line elevation

    image002_??.jpg

    Our Service:
    1. Cable making equipment delivery on time.
    2. Cable making machine commissioning: when machine completed, the commissioning shall be conducted in our factory with buyer examination. The materials for the commissioning shall be supplied by the seller.
    3. Cable machine installation: If the buyer wants the support to install our machine in his/her factory, all expenses our workers spend will be borne by the buyer, the expenses include round flight tickets, costs for visa, fees for local hotel, meals and transport in buyer's country). Salary USD 60 for one person each day.
    4. Guarantee period: The guarantee period is one year after cable equipment commissioning. During guarantee period, the seller shall be responsible for the replacement of any spare parts for free due to the quality problem, the buyer shall be responsible for the air courier or transmission fee of the spare parts.


    Our cooperated company:
    India: Thermal Cable, UDEY INSTRUMENTS, SAGAR SWITCHGEARS LIMITED, etc.
    Bangladesh: Heaven Cable etc.
    Russia: Pribor-Systems Ltd., CZKSK Co.,Ltd etc.
    Ukraine: PJSC «ODESKABEL» etc.
    Turkey: Korel Elektronik San. ve Tic. A.S etc.
    Belarus: Guangzhou Rose import & Export Co.,Ltd.
    Iran: Shahrekord Setayesh Engineering & Trading Co. etc.
    Zimbabwe: CAFCA Limited
    Egypt: Nile For Cables And Electrical Industries etc.
    North Korea: the only one optical cable company.
    China: BYD Co., Ltd, Hubei Aerospace Cable Co.,Ltd, SZKST Cable Co.,Ltd etc.


Send your message to this supplier
To:  

Dongguan Hongrong Electrical Machinery Co.,Ltd

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  

  
You May Like
Not exactly what you want? One request, multiple quotations Get Quotations Now >>
Related Searches :